Case Study
Improving Collaboration. SharePoint Extranet.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Morbi vulputate aliquam ex, quis tincidunt neque faucibus volutpat. Nulla gravida imperdiet metus, in egestas nisl auctor nec.
Business Situation:
This organization needed a fast solution that would improve collaboration and interface with the public during hearings and other public engagements.
Solution Story:
Imaginet designed and implemented a Microsoft SharePoint Extranet to run with Windows Azure. This Extranet allowed for rapid service deployment and the ability to engage with the public outside of the firewall. The initial site was set up in 6 weeks and included advanced InfoPath forms, SharePoint workflows, and document automation.
Once the SharePoint Extranet project was successfully completed, Imaginet was asked to further extend the Extranet to include:
1. Microsoft Office 365 services to deliver the Lync Online functionality.
2. Microsoft Active Directory Federated Services (ADFS) to provide users with single sign-on to Office 365 services. ADFS services were configured in a highly available (HA) configuration, and the entire SharePoint and SQL Server environments were extended to provide high availability (HA) and disaster recovery (DR) for the Extranet.
The Azure HA technologies used in this engagement included:
1. Windows Azure load balancing, availability sets, Windows failover clustering, always-on availability groups, and geo-redundant storage.
2. SQL disk configuration.
Total Duration: 6 weeks for initial SharePoint Extranet
Related Articles:
- Why Businesses Choose SharePoint for Their Enterprise Content Management System
- Imaginet SharePoint Service Offering
value provided
- · Enhanced collaboration with external partners and the public through their new SharePoint extranet.
- · Improved productivity through the use of SharePoint workflows and document automation.
- · Superb reliability and availability with high availability (ha) configuration.
Imaginet blog
Industry 4.0 Adoption – Part 6
Industry 4.0 Adoption – Part 6 December 19, 2024 Alright, if you’ve stayed with us so far, you’ve finally reached the end of this blog series. We’ve spent five articles going…
Industry 4.0 and Microsoft – Part 5
Industry 4.0 and Microsoft – Part 5 December 12, 2024 Welcome back to the penultimate post in our Industry 4.0 series. In this post, we are going to look at…
Industry 4.0 Key Components – Part 4
Industry 4.0 Key Components – Part 4 December 5, 2024 In today’s Industry 4.0 post, let’s look at some of the Industry 4.0 key components. Whether these components fit into…
Let’s build something amazing together
From concept to handoff, we’d love to learn more about what you are working on.
Send us a message below or call us at 1-800-989-6022.